How to check if the communication network is grounded at only 1 point?

Modified on Fri, 01 Mar 2024 at 12:13 PM

In a communication network, the shielding of the mesh is grounded in only 1 point to avoid possible current circulations that interfere with the serial communication of the equipment. To verify this grounding, the following test is performed:

  1. Remove the grounding point from the earth network.

  2. The continuity from the ground point (previously disconnected) to the ground is measured with a multimeter.

If the mesh is grounded at only 1 point, there will be no continuity; otherwise, check the installation where there are other grounds.


Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select atleast one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article